Mold Preventive & Repair & Modify

MOLD PREVENTIVE & REPAIR & MODIFY
  1. 24 Hours support P/M mold fresh
  2. Repair primary under control m/c
  3. Modify under control m/c
  4. Assembly, Fitting, Polishing mirror surface
  5. Mold size 30 to 850 TON
​Mold in control
  1. Heater
  2. Cooling oil
  3. Cooling water
  4. Hot Runner
Tool Room Facilities

 
Tool Room Facilities Unit
ULTRASONIC  WASHING m/c (CLIPIKA ACE) 1
VERTICAL MILLING MANUAL m/c (SHIZUOKA_VHR-A) 1
GRINDING m/c (NICCO 100x300) 1
WELDING ARGON m/c (SANWA_SW-V01) 1
WELDING LASER m/c  (WELDPRO_SW-L120) 1
FLIPPER LIFT TABLE m/c (DENSON_MAXLOAD  5 TON)
1